PERMISSION TO AMEND THE DESIGN OF THE APPROVED DEVELOPMENT (PLANNING REF: 20171127) WHICH COMPRISES CONSENT FOR THE DEVELOPMENT OF A TEMPORARY (25 YEARS) GROUND MOUNTED SOLAR PANEL PHOTOVOLTAIC (PV) FARM TO GENERATE RENEWABLE ELECTRICITY ON A 12.7HA SITE, COMPRISING SOLAR ARRAYS, ASSOCIATED ELECTRICAL INFRASTRUCTURE, FENCING, ACCESS IMPROVEMENTS AND ECOLOGICALLY BENEFICIAL LANDSCAPE WORKS AT KILLABEG, TINNACROSS, CO WEXFORD SUBJECT TO 15 CONDITIONS. PERMISSION IS ALSO SOUGHT TO AMEND THE LIFESPAN OF THE CONSENTED DEVELOPMENT FROM 25 YEARS TO 35 YEARS. AMENDMENTS PROPOSED ARE: NO CHANGES TO RED LINE BOUNDARY AND REDUCTION IN CCTV CAMERAS FROM 16 TO 11; SOLAR PANEL HEIGHT INCREASE FROM 2.3M TO 2.5M, ANGLE SPAN AMENDED FROM 20-30 DEGREES TO 10-40 DEGREES. PANEL LAYOUT SLIGHTLY RECONFIGURED AND INCREASED; EASTERN PERIMETER FENCE REMOVAL TO LINK WITH CONSENTED SOLAR FARM (REF:20171680). FENCE CHANGE FROM MESH TO DEER (COND. 14); ACCESS TRACK DECREASE OF 1,802.5M2; REMOVAL OF THE ENERGY STORAGE AREA AND INCREASE OF THE OVERALL CONSTRUCTION COMPOUND AREA FROM 2,934.56M2 TO 3,033.06M2 CHANGE FROM FOUR SUBSTATIONS/ENERGY STORAGE CONTAINERS AND ONE GRID CONNECTION SUBSTATION TO TWO SOLAR FARM SUBSTATIONS, A LARGER GRID CONNECTION SUBSTATION AND INCREASED AREAS OF HARDSTANDING RESULTING IN THEIR LANDTAKE INCREASE OF 62.06M2; OVERALL DECREASE IN GROUND DISTURBANCE AT THE CONSTRUCTION STAGE BY 1,641.94M2; OVERALL DECREASE IN LAND TAKE FOR THE DURATION OF THE OPERATIONAL STAGE BY 2,490.44M2