PERMISSION TO AMEND THE DESIGN OF THE APPROVED DEVELOPMENT (PLANNING REF: 20171680) WHICH COMPRISES CONSENT FOR THE DEVELOPMENT OF A TEMPORARY (25 YEARS) GROUND MOUNTED SOLAR PANEL PHOTOVOLTAIC (PV) FARM TO GENERATE RENEWABLE ELECTRICITY ON A 10.4HA SITE, COMPRISING SOLAR ARRAYS, ASSOCIATED ELECTRICAL INFRASTRUCTURES, FENCING, ACCESS IMPROVEMENTS AND ECOLOGICALLY BENEFICIAL LANDSCAPE WORKS AT KILLABEG, TINNACROSS, CO WEXFORD SUBJECT TO 15 CONDITIONS. PERMISSION IS ALSO SOUGHT TO AMEND THE LIFESPAN OF THE CONSENTED DEVELOPMENT FROM 25 YEARS TO 35 YEARS. AMENDMENTS PROPOSED ARE: NO CHANGES TO RED LINE BOUNDARY AND REDUCTION IN CCTV CAMERAS FROM 16 TO 11; SOLAR PANEL HEIGHT INCREASE FROM 2.3 TO 2.5, ANGLE SPAN AMENDED FROM 20-30 DEGREES TO 10-40 DEGREES. PANEL LAYOUT SLIGHTLY RECONFIGURED; WESTERN PERIMETER FENCE REMOVAL TO LINK WITH CONSENTED SOLAR FARM (REF: 20171127). FENCE CHANGE FROM MESH TO DEER FENCING (COND.14); ACCESS TRACK INCREASE OF 17.5M2; REPLACE COMBINED ENERGY STORAGE AREA AND TEMPORARY COMPOUND AREA (5,500M2), WITH 3,075M2 ENERGY STORAGE AREA AND 3,000 M2 TEMPORARY COMPOUND, REMOVAL OF GRID CONNECTION SUBSTATION AND 3 ENERGY CONTAINERS. REPLACE THREE SOLAR FARM SUBSTATIONS WITH TWO SLIGHTLY LARGER SUBSTATIONS. OVERALL INCREASE IN GROUND DISTURBANCE AT THE CONSTRUCTION STAGE OF 766.5M2. OVERALL DECREASE IN LAND TAKE FOR THE DURATION OF THE OPERATIONAL STAGE OF 2,233.5M2.