PERMISSION FOR DEVELOPMENT CONSISTS OF (A) A NEW WASTEWATER TREATMENT PLANT (WWTP) WITH ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS INCLUDING TANKS, KIOSKS, STORAGE FACILITIES, INLET WORKS 2.4M HIGH BOUNDARY FENCING AROUND THE PERIMETER OF THE WWTP; (B) UPGRADE WORKS TO THE EXISTING PRIVATE ROAD AND WIDENING OF EXISTING ACCESS AT ARTHURSTOWN; (C) 3 NO. WASTEWATER PUMPING STATIONS (WWPS) AT BALLYHACK, ARTHURSTOWN AND DUNCANNON AND ALL ANCILLARY WORKS INCLUDING KIOSKS, BELOW GROUND STRUCTURES, TELEMETRY POLES NOT EXCEEDING 5.5M IN HEIGHT, REFLECTIVE BOLLARDS DEMARKING THE PERIMETER OF THE WWPS AND ASSOCIATED CONNECTIONS TO EXISTING STORM OVERFLOW; (D) REMOVAL OF A LIMITED NUMBER OF EXISTING CAR PARK SPACES AT BALLYHACK AND ARTHURSTOWN (E) DEMOLITION OF AN EXISTING STRUCTURE AT DUNCANNON (F) C.5,270M OF BELOW GROUND INTERCONNECTING PIPELINE (G) ALL ASSOCIATED SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND. A NATURA IMPACT STATEMENT ACCOMPANIES THIS PLANNING APPLICATION